Cobra “Cryptic” Updates from 2-3-18 and 2-5-18…

I don’t usually post these items from Cobra but for some reason I felt compelled to post these. I’ve placed them in chronological order. Basically the only item that really stood out for me was the line, “COBRA velocity is set to maximum speed that does not produce L0 shockwaves“. COBRA, of course, means “COmpression BReAkthrough“.

My “Sense” is that these messages indicate a rapid buildup to the final (cabal) clearing out events, leading up to “The Event”.

Project 501 Update (2-3-18)

Alpha timeline with HVBN until intersection has collapsed due to fatal security breach that erased 741.

We are left with alternative beta timeline with sporadic HV YXRs with LEVSF pivoting to next possible HVBN before intersection.

Minimum hyperphasic requirements are set at PHI 1.35-4.00, P>0.8, THETA >0.8, VTXPOS > 1.8.

PHX clearance is approved for 180205.0600Z, PHX VTX clearance is approved for tZ=0.

COBRA velocity is set to maximum speed that does not produce L0 shockwaves.

The rest of this report remains confidential.

Absolute zero phase PHX APR sequence approved at 504 [2-5-18 0102]

Request PHX VTX clearance at 504 [2-5-18 1919]

This entry was posted in apocalypse, cabal, new energies and tagged , . Bookmark the permalink.

8 Responses to Cobra “Cryptic” Updates from 2-3-18 and 2-5-18…

  1. Pingback: voir

  2. Pingback: buy dumps usa 101

  3. Pingback: have a peek at this site

  4. Pingback: 3 ingredient chocolate bark

  5. Pingback: 다시보기

  6. Pingback: Kardinal Stick

  7. Pingback: trippy flip chocolate bar reviews

  8. Pingback: one up mushroom bar coupon code,

Comments are closed.